We are into the part of fighting against global warming. We recieved the projects from ola electric technologies private limited
| Scope | Construction Civil and PEB of facility to raw material handling with (6500 Sqmt Area). |
| Location | Vasantnarasapura |
| Project Value | 4.38 Cr. |
| Project Duration | 7 Months |
| Design |
| Architectural |
| Civil foundation design |
| Structural design |
| Heating and ventilation System |
| Process analysis and design |
| Utility heat load analysis |
| Civil/PEB |
| Civil foundation |
| Underground sump |
| Bitumen road |
| Storm water drinage |
| Effluent tratment plant |
| Paver block parking |
| MEP |
| Pre Engineering building |
| Heating and ventilation system |
| Cooling tower and piping |
| Chiller and piping |
| Boiler and piping |
| Electrical and service |